Engineers have received notification for emergency power line repair at our Werribee site for local grid failure.
Therefore, MP01 and MP02 will be shutdown for the duration. The estimate time of restoration is 8 AM (AWST).
The mining pod has been powered on. Please allow up to 15 minutes for all your devices to be visible in the portal.
It has been observed that some miners require a Restart, which can be done from the Miners interface (Web GUI), for the hashing to start.
If you are still encountering issues after this time please contact support.
Thank you for your patience.