Peak Load Alert Sunday 18th February 2024 09:36:00
Engineers have received a peak load alert from Western Power.
The shutdown for peak load is scheduled beginning 3:30pm through to 8:00pm, but likely will be shutdown earlier with high temperature forecast for today at site.
The mining pod has been powered on. Please allow up to 15 minutes for all your devices to be visible in the portal.
It has been observed that some miners require a Restart, which can be done from the Miners interface (Web GUI), for the hashing to start.
If you are still encountering issues after this time please contact support.