Peak Load Alert Monday 19th February 2024 12:45:00


Engineers have received a peak load alert from Western Power.

The shutdown for peak load is scheduled beginning 3:00pm through to 7:00pm, but likely will be shutdown earlier with high temperature forecast for today at site.

The mining pods have been powered on. Please allow up to 30 minutes for all your devices to be visible in the portal.

It has been observed that some miners require a Restart, which can be done from the Miners interface (Web GUI), for the hashing to start.

If you are still encountering issues after this time please contact support.

Thank you for your patience.